Herunterladen Diese Seite drucken

ROBBE Happy Hunter 1106 Montage- Und Bedienungsanleitung Seite 33

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

- When assembling the crane hook ensure that the pulley
19 K and the hook 20 K are free to move.
- Glue parts 23 K - 25 K together. Place the completed
crane plinth on the guide tube and check that it swivels
smoothly.
- Fit the completely assembled crane through the hole in
the main deck, and glue the crane plinth to the deck.
- Secure the crane using parts 26 K - 28 K, ensuring that it
rotates freely. Fix the spur gear 105/106 to the tube 11 K.
Crane swivel mechanism
Part
Description
No.
107
Base plate
108
Side panel
109
Motor support
110
Motor, geared 500 : 1
111
End-support
112
Shaft
113
Worm gear
114
Grubscrew with cutter tip
115
Washer
116
Coupling sleeve
117
Block
118
Self-tapping screw
29 K
Tubular rivet
- Refer to photos 86 - 88 and the detail drawing of the swi-
vel mechanism.
- Glue the side panel 108 and the motor support 109 to the
base plate 107. Install the geared motor 110.
- Assemble parts 112 - 115 and connect the shaft to the
motor using the coupling sleeve. Check that the parts line
up correctly and rotate freely, then glue the end-support
in place.
- Fit the obechi block 117 flush with the top edge of the
side panel.
The towing mechanism
Part
Description
No.
119
Base plate
120
Former
121
Brace
122
Tube
123
Servo mount
124
Servo
125
Pushrod
126
Profiled rail
127
R.H. support
128
L.H. support
129
Switch
130
Self-tapping screw
Refer to the drawing of the towing mechanism on Plan I and
photos 89 - 95.
- Glue parts 119 - 121 together. Glue the tube 122 to the
Assembly instructions
Happy Hunter
- Note: the next stage is to assemble the mechanical parts
for the auxiliary working systems. We recommend that
you start by fitting the suppressor sets 168 to the minia-
ture geared motors.
Use the motor case screws as the earth connection for
the 100 nF capacitors. Solder the connecting leads to the
terminals at the same time. Note: a connector 187 should
be fitted in the crane swivel mechanism.
Material
ABS
ABS
ABS
---
ABS
Brass
Brass
Steel
Brass
Plastic
Obechi
Steel
Brass
- Place the completed mechanism on the underside of the
deck and align it with the spur gear 105. Adjust the posi-
tion of the spur gear if necessary until it is central relative
to the worm gear. Glue the block 117 to the edge of the
hatch only.
- The mechanism is wired up at a later stage.
- Fit the tubular rivet 29 K in the underside of the tube 11
K, and secure it with a drop of cyano. File the rivet flange
back flush with the end of the tube.
Material
ABS
ABS
ABS
Brass
Plastic
---
Steel
ABS
ABS
ABS
---
Steel
former 120, and cut a 5 mm slot in it as shown.
- Place the servo mount 123 in position, and fit the servo
124 in the mount.
33
Size in mm
No.
off
1.5, die-cut
1
1.5, die-cut
1
1.5, die-cut
1
---
1
1.5, die-cut
2
2 Ø x 41
1
10 Ø
1
M3 x 3
2
2.2 I.D.
2
1.0 I.D. x 20
1
5 x 15 x 30
1
2.2 Ø x 9.5
2
3 Ø x 4
1
Size in mm
No.
off
3
1
3
1
3
1
2.2 Ø x 3 Ø x 40
1
---
1
---
1
1.5 Ø x 180
1
3.5 x 9 x 101
4
1.5, die-cut
1
1.5, die-cut
1
---
1
2.2 Ø x 9.5
2
Order No.
1106
Notes
Not included
FS
FS
Notes
Machine-cut
Machine-cut
Machine-cut
Not included
Not included
One Z-bend
Not included

Werbung

loading