5. Electrical connection

NOTICE
Material damage if the incorrect voltage
is used.
This unit may only be supplied with safety
extra-low voltage (SELV)!
5. Lay a permanent cable to the
installation location. Permitted cable:
Type J-YSTY 0.6 – 0.8mm, 4-core
6. Remove the housing cover carefully
while applying pressure equally to
each side.
7. Create an opening at the
corresponding position with a cutter
knife, in order to facilitate the cable
entry into the unit.
8. Use 2 screws to secure the bottom
part of housing to the installation
location. Suitable mounting material is
to be supplied by the customer.
9. Connect the unit according to wiring
diagram, see sticker in the housing.
5. Electrical connection | de

6. Commissioning

1. Ensure that the unit is connected
correctly. Check that the technical
data has been adhered to.
2. Switch on mains fuse and wait for the
warm-up period to elapse (approx. 15
minutes).
3. Carry out a function test.
4. Fit housing cover.

7. Disposal

Not in domestic waste! The unit
i
contains in part materials that can
be recycled and in part substances
that should not end up in the
domestic waste.
Once it has reached the end of its working
life, dispose of the unit according to the
environmental guidelines and
specifications valid where you are.
 
7