7.3 Electrical connection
i
Notes
● Always note the relevant specifications for
electrical installations and when fitting
equipment. In Germany observe DIN
VDE 0100 and the corresponding parts
in particular.
● The connection cable is fully wired at the
device end.
7.3.1 ZEG EC electrical connection
Danger to life from electric
shock
Switch the mains fuse off.
DANGER
Fit a warning notice to avoid
the unit being switched back
on.
Remove front cover [4].
Set DIP switches as required.
DIP
Function
switch
1
"Low" level: select speed level
1 or 2.
2, 3
"Normal" level: select speed level
3 to 6.
4, 5, 6
"High" level: select speed level
7 to 14.
7
Humidity switching step:
Off = 5 %, On = 10 %
8
Period of automatic mode:
Off = 30 min., On = 60 min.
DIP switch setting, levels 1...14
● The unit has 14 speed levels (when
delivered Low=1, Normal=4 and High=8).
Speed level
Volumetric
flow [m³/h]
1 Low
2 Low
3 Normal
4 Normal
5 Normal
6 Normal
7 High
8 High
9 High
10 High
11 High
12 High
13 High
14 High
Establish 230 V mains connection as
shown in wiring diagram, see reverse of
these instructions.
Fit front cover [4] and screw down.
GB
Pressure
[Pa]
85
10
110
15
127
21
150
34
170
45
200
50
225
65
248
75
270
85
290
110
320
130
335
140
350
150
375
175
13