Herunterladen Inhalt Inhalt Diese Seite drucken

Intended Use; Installation; Preparing The Unit Connection - Oase ProfiClear Premium Moving Bed Modul Gebrauchsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
- EN -
3.3

Intended use

ProfiClear Premium Moving Bed Modul, referred to in the following as "unit", may only be used as specified in
the following:
• For cleaning garden ponds.
• Operation under observance of the technical data.
The following restrictions apply to the unit:
• Only operate with water at a water temperature of +4 °C to +35 °C.
• Never use the unit to convey fluids other than water.
• Do not use for commercial or industrial purposes.
• Do not use in conjunction with chemicals, foodstuff, easily flammable or explosive substances.
4

Installation

• The following tools are required:
– 10 mm ring spanner
– 7 mm socket spanner
– PZ3 Phillips screwdriver
– Cordless drill/screwdriver with PZ3 bit (do not set to "drill"!)
4.1

Preparing the unit connection

Before installing, connecting and starting up the unit, perform the following tasks:
– 1 Fit 1× DN 75 slide valve ( A 9)
– 2 Fit 2× ∅ 180 mm inlets ( A 4)
– 2 Fit 2× DN 150 outlets ( A 7)
– 2 Fit 2× meshed tubes ( A 6)
• Remove the container cover.
Fitting the DN 75 slide valve
How to proceed:
 B
1. Fit the slide valve into the connecting sleeve and secure with a hose clip.
2. Fit the connecting sleeve onto the connection.
3. Secure the holding plate of the slide valve to the outside of the container with cap nuts.
4. Secure the hose clip on the connection.
Fitting the meshed tube
How to proceed:
 C
1. Fit the first meshed tube onto the meshed tube holder such that the white cable binder on the diffusor is
aligned to the recess on the right next to the triangular marking.
– Ensure that the engagement hook on the meshed tube holder engages in a mesh of the meshed tube.
2. Fit the second meshed tube onto the meshed tube holder such that the white cable binder on the diffusor is
aligned to the recess on the left next to the triangular marking.
– Ensure that the engagement hook on the meshed tube holder engages in a mesh of the meshed tube.
3. Fit a meshed tube holder onto the other end of each meshed tube.
– Ensure that the triangular markings of the opposing meshed tube holders are aligned in relation to each
other.
– Ensure that the engagement hook on the meshed tube holder engages in a mesh of the meshed tube.
20

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis