Herunterladen Inhalt Inhalt Diese Seite drucken

Setting Up And Connecting To The Power Supply; Requirements On The Installation Site; Electrical Connection; Handling And Operation - Silvercrest SFS 150 B3 Bedienungsanleitung

Folienschweissgerät
Vorschau ausblenden Andere Handbücher für SFS 150 B3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Setting up and connecting to the power supply

Requirements on the installation site

For safe and fl awless operation of the appliance, the installation site must comply
with the following requirements:
When setting it up, place the appliance on a fi rm, fl at and horizontal
surface.
Do not operate the appliance in a hot, wet or very humid environment or
close to combustible material.
The mains power socket must be easily accessible, so that the power cable
can be easily disconnected in the event of an emergency.

Electrical connection

IMPORTANT
Before you connect the appliance, compare the connection data (voltage
and frequency) on the data plate with that of your mains power network.
This data must match in order to avoid any damage to the appliance.
Ensure that the power cable is undamaged and is not routed over hot
surfaces and/or sharp edges.
Ensure that the power cable is not taut or kinked.
Do not let the power cable hang over edges (trip wire eff ect).
Insert the plug into a mains power socket.

Handling and operation

In this chapter you receive important information for the handling and operation
of the appliance.
Inserting the tube fi lm
Open the roll storage compartment
Fold the guide rail
of tube fi lm through between the guide rail
Close the roll storage compartment
cutting device
SFS 150 B3
and insert a roll of tubular fi lm.
of the cutting device
and fold the guide rail
back down.
to the rear and pull a piece
and the appliance lid.
of the
GB
IE
CY
7

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis