Herunterladen Inhalt Inhalt Diese Seite drucken

PeakTech 3260 Bedienungsanleitung Seite 30

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

2. Remove the back cover by unscrewing the four screws and
pulling off the meter's cover.
3. Remove the blown fuse.
4. Install the new fuse in the fuse compartment.
1A / 500 V F; 6 x 32 mm
10A / 500 V F; 6 x 32 mm
5. Replace the cover and secure it with the screws.
WARNING!
Do not operate your meter until the back cover is in place and fully
closed.
All rights, also for translation, reprinting and copy of this manual or
parts are reserved.
Reproduction of all kinds (photocopy, microfilm or other) only by
written permission of the publisher.
This manual considers the latest technical knowing. Technical
alterations reserved.
We herewith confirm, that the units are calibrated by the factory
according to the specifications as per the technical specifications.
We recommend to calibrate the unit again, after 1 year.
®
© PeakTech
08/2014/Ho/Th.
PeakTech Prüf- und Messtechnik GmbH - Kornkamp 32
- DE-22926 Ahrensburg / Germany
+49-(0) 4102-42343/44 +49-(0) 4102-434 16
info@peaktech.de
www.peaktech.de

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis