Herunterladen Inhalt Inhalt Diese Seite drucken

Fronius Power Package Installationsanleitung Seite 66

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

8
3
9
4
IMPORTANT!
-
-
1
5
64
1
3
6
2
5
1
4
Use appropriate ferrules when connecting the individual lines.
Calculate the cable lengths so that no loops are created.
2
-
Pull the plastic clamp upward
-
Loosen the metric screw joint on the
underside of the AC Combiner
-
Insert the AC IN cable through the me-
tric screw joint from below into the AC
Combiner
-
Attach the clamp of the strain-relief de-
vice to the rail
-
Fix the AC IN cable in place using the
9
8
clamp of the strain-relief device
Cross-head screwdriver
Tightening torque = 1.5 Nm
7
-
Connect the ground conductor PE to
the lower copper rail labelled with "PE"
TX25 Torx screwdriver
Tightening torque = 3.0 Nm
1

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis