Herunterladen Inhalt Inhalt Diese Seite drucken

Reel Bearing; Lift Cylinders; Antisway Spring - Jacobsen Greens King IV Handbuch

Vorschau ausblenden Andere Handbücher für Greens King IV:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.5

REEL BEARING ___________________________________________________________

Excessive end play or any radial play indicates bad
bearings, a weak tension spring, or a backed off nut.
1. Check bearing housing mounting hardware. Tighten
or replace components as required. Carefully clean
threads with degreaser.
2. Apply a medium strength grade of Loctite to nut
(AA), then thread nut onto the reel shaft until the nut
is
1-27/32 in. (46 mm) from the end of the reel
shaft.
3. Fill reel bearing housings with NLGI - Grade O
grease after adjusting spring.
4.6

LIFT CYLINDERS __________________________________________________________

1. Fully extend the front cylinder, then check spacing
at the cam roller (U). The dimension should be 7/16
to 9/16 in. (11.1 to 14.2 mm).
2. Loosen nut (V) then grip the very end of the cylinder
rod, close to the adjusting nut (point W) and turn
until spacing is correct. Tighten nut (V).
3. Loosen nut (X) on the rear lift cylinder. Adjust the rod
end (Y) until the lift arm (O) just touches the stop
bracket when the cylinder is fully retracted.
4.7

ANTISWAY SPRING ________________________________________________________

1. The antisway spring (C) should be tight but not
under stress.
2. Loosen both nuts on the adjusting rod then adjust the
rear nut as necessary.
3. When properly adjusted, tighten nuts against
bracket.
ADJUSTMENTS
AA
U
7/16 to 9/16 in.
(11.1 to 14.2 mm)
Stop Bracket
O
1-27/32 in.
(46 mm)
Figure 4E
W
Figure 4F
X
Y
Figure 4G
C
GKV 2
Figur e 4H
4
AA
GKV-11
V
GKV-8
GKV-9
17

Werbung

Kapitel

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Greens king iv plus

Inhaltsverzeichnis