x) fasten side strips after FSL mounted with 2 screws at 450 and 560 size only (take care of unobstructed opening of flaps) 
7.
Commissioning 
7.1 
Preconditions 
Please see Installation and operating Instructions for DVV/DVVI! 
7.2 
Commissioning 
Check: 
Assembling of the FSL with DVV (fixing, eventual deformations); 
Installation residuals and foreign objects have been removed from the fan and ducts; 
Then start the fan and check it for proper operation  (opening of flaps, eventual vibrations). 
8.
Maintenance/trouble setting 
The following must be controlled periodically (according to system maintenance book, minimum once a year, more 
frequently depending on operating conditions): 
Check the function of the flaps – smoothly opening and closing; 
Check the bearings, if the gap has not increased – the flaps must not influence on each other; 
Check all joints, if everything is properly fastened. 
If the reason of malfunction or difficulty can not be clearly determined, inform the customer service of the manufac‐
All other hints please see Installation and operating Instructions for DVV/DVVI! 
turer.  
14 
 
Commissioning 
 
 
FSL 30.09.2013 