Wall mounting

Wiring according to EMC requirements

Conditions for trouble−free operation:
Except for the mains cable, use shielded cables only.
l
The shield must be carefully connected to PE.
l
Separate control and mains cables from motor cable!
l
Connect motor and mains PE conductors to separate PE terminals.
l
A
B
C
D
F
Fig. 16
0
Mains cable L1, L2, L3, PE
1
PE connection − mains cable
2
Use shielded motor cable (use low capacity motor cables)
3
EMC cable connection for motor cables
4
PE connection − motor cable
5
Shielded control cable
6
Shield connection for control cable (screw shield to shield sheet)
7
PE connection − terminal strip X2
8
Isolated terminal (e.g. star point for motor star connection)
9
Function module
X1
Terminal strip − mains connection
X2
Terminal strip − motor connection
PES
HF shield connection by connecting the shield with a surface as large as possible to PE
90
X1
E
G
EDK82MV222 DE/EN/FR 8.0
Shield connection
1. Prepare cable
X2
H
2. Route the cable through
I
J
3. Tighten the screw. The
8200mot100
the eyebolt of the shield
and bend the eyebolt.
shield must be tightly
connected to the shield
sheet.
0.7 Nm
6 lb-in
PES
L