Herunterladen Inhalt Inhalt Diese Seite drucken

Schaudt LAS 1218-2 Bedienungs- Und Montageanleitung Seite 31

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Fusing
810.523 BA / EN
Instruction Manual and Installation Instructions LAS 1218-2
The connector cable (Pos. 2 or 3) is required to connect the LAS 1218-2
battery charger to the electroblock.
An additional fuse is not required as there is already one integrated in the
electroblock. You only have to check if the fuse is fitted and if it complies
with the fuse rating on the label.
The battery charger is connected to the electroblock with a 2-pin charger ca-
ble. Other lengths are available on request.
A connection to the starter battery is not required, because the electroblock
already has the start battery recharge module.
1
X
Fig. 3
Connection Diagram of LAS 1218-2 Battery Charger - - on Electroblock
1
Flat push-on contacts, 6.3 x 0.8, red cable
2
Flat push-on contacts, 6.3 x 0.8, brown cable
3
not assigned
4
+ Living area battery (red)
5
Negative battery (brown)
2-pin charger cable: LAS 1218-2 to electroblock connection
+ terminal of LAS 1218-2 living area battery: Flat push-on contact, 6.3
F
x 0.8; (Fig.3; Pos. 1)
-- terminal of LAS 1218-2: Flat push-on contact, 6.3 x 0.8; (Fig.3;
F
Pos. 2)
MNL connector (view X, Fig. 3; Pos. 4/5) or Minifit connector on elec-
F
troblock, base "auxiliary charger" ; see also instruction manual for
electroblock
Date: 06.11.2014
X
3
2
4 5
11

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis