Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Fault Rectification - Maico ZEG EC Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

The unit starts once the mains fuse is
i
switched on. The operating unit's LED
flashes briefly.

8. Maintenance

The unit is maintenance-free.

9. Fault rectification

● Call on the services of a trained
electrician any time there is a fault.
● Repairs should only be carried out by a
trained electrician.
Danger to life from electric
shock
 Before repairs, switch off
DANGER
mains fuse and fit a warning
notice to prevent it from being
switched back on.
Fault
Cause/measure
Unit doesn't run No mains voltage.
 Check that the mains
Thermal
Motor too hot.
overload
 Wait until motor and
protection
switches the
unit off.
Deposits on the
Deposits.
impeller and in
 Call on the services of a
the housing
caused by dust
in the air.
 Under no circumstances
fuse is switched on.
temperature limiter have
cooled. The cooling
period can last up to
15 minutes. Then
switch the unit back on.
trained specialist.
Fit air filter in duct
system.
should the inside of the
unit be cleaned with
water or a high-pressure
cleaner.
Fault
Cause/measure
Battery flat.
ZEG EC:
The ventilation
 Replace operating unit's
levels can no
longer be
switched with
the operating
unit.
10. Dismantling
Danger to life from electric
shock
 Before dismantling, switch off
DANGER
mains fuse and fit a warning
notice to prevent it from being
switched back on.
● Dismantling should only be carried out by a
trained electrician.
11. Disposal
Before disposing of the unit, remove
battery from operating unit and take to
an authorised recycling collection
point.
Not in domestic waste.
i
The unit contains in part material that
can be recycled and in part
substances that should not end up as
domestic waste.
 Once it has reached the end of its
working life, dispose of the unit
according to the environmental
guidelines and specifications valid
where you are.
battery (type: 3 V
CR2025). To do this
take operating unit up
and out of bracket and
remove back. Replace
battery, ensure correct
polarity. Secure back
and refit.
GB
15

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Zeg 2000Zeg 2000 p

Inhaltsverzeichnis