Herunterladen Diese Seite drucken

Ruris RX 655 Handbuch Seite 43

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 356
EN
Engine oil bath capacity 0.6l.
The oil level is checked with the dipstick attached to the oil tank cap (threaded).
Change the engine oil after the first 5 hours of operation, which is the break-in period,
then every 25 hours of operation or every 6 months.
6.2 FUEL SUPPLY
Use quality fuel from authorized Peco stations.
Fill with the best quality UNLEADED PETROL fuel, using a metal funnel, in open areas
and away from sources of fire or sparks that could cause a fire.
14
loading