Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Before Switching On - Lenze E82MVxxx 2B Serie Montageanleitung

0.25 ... 0.37 kw
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

7

Commissioning

Before switching on

)
Note!
Do not change the switch−on sequence.
ƒ
In the event of a fault during commissioning please see the chapter
ƒ
"Troubleshooting and fault elimination".
In order to avoid personal injuries or material damage, check the following before
connecting the mains voltage:
ƒ The wiring for completeness, short circuit, and earth fault
ƒ The "emergency stop" function of the system
ƒ The motor circuit configuration (star/delta) must be adapted to the output voltage
of the controller.
ƒ If no function module is used, the FIF cover has to be fitted (delivery status).
ƒ If the internal voltage source X3/20, e.g. of the standard I/O is used, terminals X3/7
and X3/39 have to be bridged.
EDK82MV371 DE/EN/FR 7.0
Commissioning
l
Before switching on
7
107

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

8200 motec

Inhaltsverzeichnis