Herunterladen Inhalt Inhalt Diese Seite drucken

Operation; Buttons And Symbols - Quick Tools Qu959D+ Bedienungsanleitung

Heißluft-lötstation
Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 5

2.5. Operation

ATTENTION: Before switching on, check whether the operating voltage
corresponds to the voltage specified on the type plate!
Make sure that the station is always switched off when plugging or unplugging
the handset. Failure to do so may result in damage.

2.5.1 Buttons and Symbols

Set air volume
°C
CH1 CH2 CH3
CH0
COOL
SLEEP
CAL
2.5.2 Hot air holder
The holder for the hot air piston must be mounted on the left
or right side of the station. To do this, 2 screws on the side of
the station must be loosened. Then the holder can be
fastened with the 2 screws.
3 memory locations
▲/▼ change
temperature
Air volume
Temperature
3 memory locations
Manual adjustment
Cooling phase
Standby
Calibration
4
USER MANUAL
Inhaltsverzeichnis
loading

Inhaltsverzeichnis