6
Check Before Power-On
Controleren vóór inschakeling
Kontrola przed uruchomieniem
Check Item
1
Equipment exterior
2
Cable exterior
3
Cable connection
4
Cable routing
5
Switch
Acceptance Criteria
The equipment is intact and free from rust and paint flake-off. If the paint flakes off, repair the damaged paint.
The labels on the equipment are clear. Damaged labels must be replaced.
Cable sheathings are intact and not damaged.
Cable hoses are intact.
Cables are connected in the designed positions.
Terminals are prepared as required and securely connected.
Labels on both ends of each cable are clear and specific, and attached in the same direction.
Electrical and extra low voltage (ELV) cables are routed separately.
Cables are neat and tidy.
Cable tie joints are evenly cut without burrs.
Cables are placed properly with slack at bending points to avoid stress.
Cables are routed neatly without twists or crossovers in the cabinet.
The RCM disconnector is OFF. (Optional. This item applies only when there is an RCM disconnector.)