5.2.
AC VOLTAGE MEASUREMENT
• The maximum input AC voltage is 600V. Do not measure voltages
exceeding the limits given in this manual. Exceeding voltage limits could
result in electrical shocks to the user and damage to the instrument
• In the Phase-Ground voltage measurement after a RCD device, to
avoid unexpected trip-out of it, connect before the test leads between
Phase-Neutral cables for at least 5s, then perform the Phase-Ground
measurement.
Fig. 4: Use of the instrument for AC voltage measurement
1. Switch on the instrument by pressing the ON/OFF key. The measuring mode
automatically selected and the indication
2. Insert the red cable into input terminal V/Ω/
COM
3. Position the test leads in the desired spots of the circuit to be measured (see Fig. 4).
The instrument automatically switches to AC voltage measurement for value > ca.
1.5V. The display shows the value of voltage.
4. The message
measurable value.
5. To use the AutoHOLD function and the NCV sensor, see § 4.3.2 and § 4.3.4
"
"
O.L.
indicates that the value of AC voltage exceeds the maximum
CAUTION
"
"
OL.
appears on the display.
and the black cable into input terminal
EN - 9
FLASHMETER
Ω
is