Herunterladen Diese Seite drucken

Agilent Technologies MS120 Single Stage Rotary Vane Bedienungshandbuch Seite 153

Werbung

Tab. 3
Servicing frequency
24 Hours/every day
100 Hours / every week
9000 Hours / every year
14000 Hours / every 2 years
30000 Hours / every 5 years
Oil change
It is recommended to wait a hour and a half after turning off the
pump before beginning the process of changing the lubricant oil to
allow the internal temperature of the pump and oil to cool
sufficiently.
WARNING!
Use protective gloves to avoid injury caused by heat.
Please refer to Figure 14, Unscrew the oil filling plug (E) and the
discharge plug (G) only after having placed underneath the pump
tank a suitable container suitable container (see Figure 15 proper
size and shape) for collecting the total quantity of oil.
MS120 Single Stage Rotary Vane Pumps (G2571-64000) User Manual/X3702-90000 (A) 153/188
Service operations
Description of the operation
Check oil level before starting.
Clean with soft cloth surfaces of the pump. If
necessary, you can use a neutral detergent.
Change the lubricating oil.
Replace the exhaust filter.
Check the electrical connections.
Pump overhaul.
Instructions for Use
Maintenance
Authorized personnel
Operator
Operator
Skilled Worker
Skilled Worker
Skilled Worker
Customer Service
4

Werbung

loading

Diese Anleitung auch für:

G2571-64000Ms120 single stage rotary vane pumpsX3702-64000