2  Safety
2 Safety
2.1 Intended Use
The Inverter Manager is a device for monitoring and
controlling up to 42 SMA inverters of the type STP 60-10
and STP 60-US-10 in decentralized PV systems and
large-scale PV power plants with up to 2.5 MW power.
The I/O Box is a multi-function interface for one
Inverter Manager. The I/O Box receives commands for grid
management services via digital signals and sends these
specifications to the Inverter Manager.
The Inverter Manager receives the specifications from the
I/O Box and controls all inverters in the system accordingly.
The Inverter Manager and the I/O Box must only be used
indoors and must only be operated with the SMA inverter
Sunny Tripower 60 (STP 60-10 and STP 60-US-10).
Use this product only in accordance with the information
provided in the enclosed documentation and with the
locally applicable standards and directives. Any other
application may cause personal injury or property damage.
For safety reasons, it is not permitted to modify the product
or install components that are not explicitly recommended
or distributed by SMA for the product. Unauthorized
changes or modifications will void all warranty claims and
the operating license. Any use of the product other than that
described in the Intended Use section does not qualify as
appropriate.
The type label must remain permanently attached to the
product. The enclosed documentation is an integral part of
this product.
2
IMVIOBOX-IA-xx-10
SMA Solar Technology AG / SMA America, LLC
3 Inverter Manager
3.1 Scope of Delivery
Check the scope of delivery of each product for
completeness and any externally visible damage. Contact
your distributor if the scope of delivery is incomplete or
damaged.
Figure1: Components included in the scope of delivery of the
Inverter Manager
Position Quantit
Designation
y
A
1
Inverter Manager
B
2
Wall mounting bracket
C
1
Bracket for mounting on top-hat rail
(35 mm DIN rail)
D
1
Connection for electricity supply
E
1
Connecting terminal plate for
electricity supply
F
2
Bootlace ferrules
G
2
Screw for wall mounting
H
1
Installation manual
Installation Manual