Herunterladen Diese Seite drucken

Endress+Hauser Proline 300 Bedienungsanleitung Seite 23

Vorschau ausblenden Andere Handbücher für Proline 300:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4 →
Teqwave M
6
Carefully press down the ISEM (1), tighten the screws as per the torque (2)
and plug in the ribbon cable (3).  Pay attention to connector coding!
For detailed information on the electrical connection, see the "Electrical connection"
section of the Operating Instructions for the device.
For detailed information on commissioning, see the "Commissioning" section of the
Operating Instructions for the device.
Endress+Hauser
5 →
Align the ISEM in the sensor connection housing and position on the
sensor interface as shown in the graphic.  Pay attention to pin diagram!
1.
3.
2.
0,6 Nm
(0.4 lbf ft)
T10
EA01278D
23

Werbung

loading

Diese Anleitung auch für:

Proline 400Proline 500Proline 500-digital