Remove the S-DAT from the interface. Do not damage the S-DAT!
1 →
‣
Promass, t-mass
7.4
Reassembling the transmitter
Reassemble the transmitter by following the removal procedure in reverse order, as described
on → 7.
Note the following:
7.5
Note on reassembling the Promag 300
7.5.1
Standard transmitter
NOTICE
Poor measuring performance!
If the grounding switch is in the wrong position, this impacts the measuring performance!
‣
Check that the grounding switch is in the correct position and correct if necessary!
1 →
‣
Version A: If a grounding switch
is provided on the ISEM: set the
grounding switch of the ISEM to
the "left" position (closed).
Endress+Hauser
2
‣
Prosonic Flow
2
‣
Version B: If a jumper is
provided on the ISEM: plug in
the jumper for the ISEM
grounding setting on the inside
(closed).
EA01278D
13