Herunterladen Diese Seite drucken

krick ANTARES Baubeschreibung Seite 64

Gaffelkutterjacht

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Stick adhesive tape inside the edge of the
superstructure. Then clip both roof frames 55
onto the sides of the superstructure.
Now stick on the roof bulkheads 56 to 58.
Next, adjust and stick on both reinforcements
61.
Now stick on both roof sections 59 and 60.
Updated June 2016
The roof sections are oversized so the over-
hang can be adjusted to the superstructure.
Only adjust the overhang after panelling with
the mahogany veneer.
Now all of the removable parts have been at-
tached and can be decorated with the mahog-
any parts.
Parts 88 to 94 are required for the skylight.
Glue on all of the parts one after another.
Then attach the window frame 95 and the
porthole.
Page 16
©
Krick Modelltechnik Knittlingen

Werbung

loading

Diese Anleitung auch für:

20370Antares 20370