EN
4.2 BASE INSTALLATION
1. Place the base on the floor. Make sure there is enough space on the sides of the base (at least
0.5 m) and in front of the base (at least 1.5). Don´t expose the charging dock to sunshine.
2. Connect the base to electric mains (Light indicator D1 lights up).
3. Check correct installation of dust bag G in compartment D8 or insert the bag to the compartment.
4. If you will use the mopping function, remove the clean water tank E and fill it with clean
water (up to MAX mark). Then insert it back in place.
EN - 52