Instruction CF-MC Master Controller
5.8 More (2-3) Master Controllers
Notes: Master Controller #1 should be the one connected to the local sup-
plying pump.
Up to Master Controllers can be connected in one system.
If there are or Master Controllers, connect them to a 0V power
supply within a distance from Master Controller #1 that allows simulta-
neous handling of all the Master Controllers
Activate Install mode on Master Controller #1(fig. 21)
• Use the menu selection button
LED
flashes
• Activate Install mode by pressing OK
Initiate installation on Master Controller #2 or #3(fig. 22)
• Activate installation to Master Controller #1 by pressing OK
• Install LED
and
and goes OFF when installation is complete
• Relocate Master Controller # and/or # if necessary. Link test will be
initiated automatically on reconnection to 0V power supply
• If Master Controller # and/or # has it's own pump and/or boiler etc.
configure the relays for pump and boiler control accordingly (see 6.)
Note: Later removal of Master Controller #2 or #3 from Master Controller #1
can only be done by resetting Master Controller #1 (see 6.5)
VI.UH.K1.52
to select the Install mode. Install
flickers during communication
Produced by Danfoss Floor Heating Hydronics 08.005
. Install LED
goes ON
1