Herunterladen Diese Seite drucken

Nilfisk Advance BA 410 Betriebsanleitung Seite 63

Vorschau ausblenden Andere Handbücher für Advance BA 410:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MAINTENANCE
The lifespan of the machine and its maximum operating safety are ensured by correct and regular maintenance. The following chart
provides the scheduled maintenance. The intervals shown may vary according to particular working conditions, which are to be
defi ned by the person in charge of the maintenance.
WARNING!
Maintenance procedures must be performed with the machine switched off and the batteries/battery charger
cable disconnected.
Moreover, carefully read the instructions in the Safety chapter.
All scheduled or extraordinary maintenance procedures must be performed by qualifi ed personnel, or by an authorised Service
Centre. This Manual describes only the easier and most common maintenance procedures.
NOTE
For other maintenance procedures shown in the Scheduled Maintenance Table, refer to the Service Manual that can be
consulted at any Service Center.
SCHEDULED MAINTENANCE TABLE
Procedure
Squeegee cleaning
Brush cleaning
Tank and vacuum grid cleaning
Squeegee blade check and replacement
Solution fi lter cleaning
Battery charging
WET battery fl uid level check
Screw and nut tightening check
Brush motor carbon brush check and replacement
Vacuum system motor carbon brush check and replacement
(1) And after the fi rst 8 working hours.
(2) This maintenance procedure must be performed by an authorised Nilfi sk-Advance Service Center.
USER MANUAL
Daily, after us-
Weekly
ing the machine
BA 410
909 5683 000(2)2007-06 A
ENGLISH
Every six
Yearly
months
(1)
(2)
(2)
17

Werbung

loading