Miele PDR 910 G Installationsplan Seite 35

Gewerblicher trockner gasbeheizt
Vorschau ausblenden Andere Handbücher für PDR 910 G:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Tables
Required flow rate
Consumption cal-
orific values
Settings with nat-
ural gas / liquid gas
Natural gas E
Natural gas LL
Liquid gas
The rated load is based on the following calorific values (gas refer-
ence values: temperature 15 °C; absolute pressure: 1013 mbar):
Natural gas E (G 20)
Natural gas LL (G 25)
Liquid gas (G 31)
In the case of natural gas G25, up to 3 mbar of pressure loss may
occur when checking the inlet pressure.
 Danger! The jet pressure is checked/adjusted while the
gas-heated tumble dryer is operating. Caution: mains voltage!
Servicing, modification, testing and maintenance of electrical appli-
ances must be carried out in accordance with all appropriate legal re-
quirements, accident prevention regulations and valid standards.
The jet pressure is checked/adjusted with the side panel removed.
- Fit the front panel and the control panel.
- Connect the gas-heated tumble dryer to the gas and electricity
supplies for testing.
en - Installation notes
Rated heat load Hi
8 kW
8 kW
7.5 kW
34.02 MJ/m
29.25 MJ/m
46.3 MJ/kg (Hi)
Density ratio: 1.55
Air density: 1.2 kg/m
Flow rate
3
0.847 m
/h
3
0.985 m
/h
0.571 kg/h
3
(Hi)
3
(Hi)
3
35