Gas
Connection and
conversion in-
structions
Initial connection
Converting to an-
other gas type
Order of steps for
commissioning or
conversion work
Shut-off equipment and connection hose for the gas connection
must be fitted by the customer on site.
A suitable connection hose can be purchased from Miele as an op-
tional accessory.
The initial connection must be carried out by a licensed specialist
company according to specific national regulations.
 The configuration ex works must allow the tumble dryer to be
operated with the relevant gas family, gas group and connection
pressure.
This tumble dryer is configured ex works for operation with natural
gas E (H), G 20.
The data plate provides information about the gas inlet pressure and
the corresponding jet pressure. Compare the specifications on the
data plate with those of the gas network operator.
The required gas valve settings are described in the accompanying
setting and conversion instructions.
 Danger if conversion work is not performed correctly.
Conversion work must be performed by authorised specialists only.
If the dryer is to be converted to a gas type other than the one spe-
cified on the data plate, refer to the accompanying setting and con-
version instructions.
 Risk of explosion if gas-heated tumble dryers have leaks.
Once the work has been completed, there is a risk that the gas-
heated tumble dryer may have a leak and gas may escape.
After completing any commissioning, maintenance, conversion or
repair work, check the tumble dryer for leaks. Particular attention
must be paid to the measurement connections on the gas valve.
Checks must be performed when the burner is both switched on
and switched off.
Check that the points listed in "Supply air and exhaust air manage-
ment" have been taken into consideration.
The steps below should be followed in the given order when commis-
sioning or converting the machine.
1.
Ask the gas supply company what the gas family, gas group
and connection pressure are. Compare this information with the
values specified on the machine (see data plate).
en - Installation notes