Herunterladen Diese Seite drucken

Miele PDR 910 G Installationsplan Seite 32

Gewerblicher trockner gasbeheizt
Vorschau ausblenden Andere Handbücher für PDR 910 G:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en - Installation notes
32
It is advisable to connect the product via a suitably rated plug and
socket in accordance with IEC-60309, otherwise for a hardwired con-
nection an all pole means of isolation must be installed at the site.
An isolation device is a switch which ensures a contact opening of
more than 3 mm. These include circuit breakers, fuses and contact-
ors (IEC/EN 60947).
If the mains supply cannot be permanently disconnected, the isola-
tion device (including plug and socket) must be safeguarded against
being switched on either unintentionally or without authorisation.
The tumble dryer must not be connected to devices such as timers
which would switch it off automatically.
If local regulations require that a residual current device (RCD) is in-
stalled, a type B residual current device (sensitive to universal cur-
rent) must be used.

Werbung

loading

Diese Anleitung auch für:

Pdr 910