Herunterladen Diese Seite drucken

Miele PDR 910 G Installationsplan Seite 34

Gewerblicher trockner gasbeheizt
Vorschau ausblenden Andere Handbücher für PDR 910 G:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
en - Installation notes
34
2.
Check and correct the factory-set jet pressure based on the
tables "Settings with natural gas" and "Settings with liquid gas".
3.
If the gas family, gas group or connection pressure is different, it
must be converted as instructed in the connection and conver-
sion instructions ("Setting and conversion instructions for gas").
You must then change the data plate.
Follow the accompanying setting and conversion instructions
when changing the gas family. If there is no setting and conver-
sion kit available, you can request one from the Miele Customer
Service Department. Please quote the following:
– the model
– the number of the tumble dryer
– the gas family
– the gas group
– the gas connection pressure
– the country where the machine has been installed
Set the jet pressure at the machine's gas regulating valve (see
"Settings with natural gas/liquid gas" section and the accom-
panying setting and conversion instructions).
4.
Switch on all gas consumers that are present, including the in-
stalled tumble dryer.
5.
Measure the connection pressure. The connection pressure
must correspond to the data plate information and the ac-
companying setting and conversion instructions.

Werbung

loading

Diese Anleitung auch für:

Pdr 910