Herunterladen Diese Seite drucken

Motorola PMLN6521 Installationsanleitung Seite 12

Vorschau ausblenden Andere Handbücher für PMLN6521:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 73
POWER CABLE INSTALLATION
Note:
This installation procedure is applicable to PMLN6434 &
PMLN6431 Vehicular Charging Cradle with Vehicular Power
Module Kit only. The PMLN6434 & PMLN6431 Vehicular
Charging Cradle with Vehicular Power Module Kit supports
12 VDC vehicular batteries only.
The Vehicular Charger Kit power cable is equipped with
5-Ampere fuse for battery positive terminal and 1-Ampere fuse for
ignition. Verify that the vehicle electrical system can support current
values larger than the fuse ratings.
The fuse in the red wire should be connected to the power source
using the shortest practical length.
The Vehicular Charger Kit is only for use with a negative ground
system.
!
a u t i o n
Red Lead
Bulkhead
Grommet
Figure 6. Power Cable Routing Into Engine Compartment
Remove the fuse from the power cable's red and
blue (ignition) wires before proceeding and tape
them to their respective fuse holders before
making any connection. DO NOT insert fuses
until all connections have been made and
carefully inspected.
Molded In- Line
Fuse Holder
Mounting
Hole
Engine
Compartment
Black Lead
Fuse
Terminal
To Vehicle
Lugs
Chassis Ground
10
Cover
Red Lead
To Battery (+)

Werbung

loading

Diese Anleitung auch für:

Pmln6522Pmln6432Pmln6433Pmln6434Pmln6431