Herunterladen Inhalt Inhalt Diese Seite drucken

De Dietrich DKS7580X Gebrauchsanleitung Seite 80

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 30
5
CARE
PROGRAMMING A PYROLYSIS
CLEANING CYCLE
Two pyrolysis cycles are available. The
durations are pre-selected and cannot be
modified:
Pyro ECO: in 1h30
for cleaning to save energy.
Turbo Pyro: in 2:00
for more in-depth cleaning of the inside
of the oven.
IMMEDIATE CLEANING
- Select the "CLEANING" function when
you are in the general menu then
confirm.
- Select the most suitable self cleaning
cycle, for example Turbo Pyro, and
confirm.
The pyrolysis cycle begins. The time
starts to count down immediately it is set.
During pyrolysis, the symbol
in the programmer to indicate that the
door is locked.
At the end of the pyrolysis cycle, 0:00
flashes.
A cooling phase occurs after each
pyrolysis
and
unavailable during this time.
When the oven is cool, use a
damp cloth to remove the white
ashes. The oven is clean again and
ready for further cooking operations.
displays
your
oven
remains
SELF CLEANING WITH DELAYED
START
Follow the instructions described in the
previous section.
- Select the end time symbol (delayed
start)
and confirm.
- Set the pyrolysis end time you want
with the control knob and confirm.
After these steps, the oven switches to
standby and the start of pyrolysis is
delayed so that it finishes at the
programmed time.
When the pyrolysis is complete, switch
your oven off by pressing the
24
key.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis