Herunterladen Inhalt Inhalt Diese Seite drucken

Before Initial Operation - Pkm GT 250 A++ M Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

 The figure above is an example only. Modifications are possible.
I
NTERNAL SIDE OF THE DOOR OF THE FREEZER
6
L
IGHT

4.2 Before initial operation

NOTICE! Leave the appliance in an upright position for 4-6 hours before
you connect it to the mains to ensure, that the oil has flowed back into
the compressor.
NOTICE! If you use the appliance for the first time or the appliance has
been disconnected from the mains for a longer period of time, allow the
appliance to cool down for 3 until 4 hours (s. chapter 4.5
) before you place any fresh or frozen food in the
TEMPERATURE
appliance. If you place food in the appliance before it has reached its
normal operating temperature, this foods can thaw and / or spoil.
1. Remove all packaging materials.
2. Adjust the feet and clean the appliance (see chapter
MAINTENANCE
3. Do not start the appliance immediately after installation. Wait 4-6 hours to
ensure proper operation.
4. Connect the appliance to the mains properly.
5. The noise generated by the compressor and the gases / liquids of the appliance
is normal.
/ L
AMP COVER
).
(depending on model)
51
:
SETTING OF THE
CLEANING AND

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis