Herunterladen Inhalt Inhalt Diese Seite drucken

Initital Switch-On - Lenze Inverter i550 Cabinet Montage- Und Einschaltanleitung

Vorschau ausblenden Andere Handbücher für Inverter i550 Cabinet:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commissioning

Initital switch-on

Initital switch-on
Target: achieve rotation of the motor connected to the inverter as quickly as possible.
Requirements:
• The connected motor matches the inverter in terms of power.
• The parameter settings comply with the delivery status (Lenze setting).
1. Preparation
1. Wiring of power terminals. (Chapter )
2. Wire digital inputs X3/DI1 (start/stop), X3/DI3 (reversal of rotation direction), and X3/DI4 (preset fre-
quency setpoint 20 Hz).
3. Do not connect terminal X3/AI1 (analog setpoint selection) or connect it to GND.
2. Switch on mains and check readiness for operation
1. Switch on mains voltage.
2. Observe LED status displays "RDY" and "ERR" on the front of the inverter:
a) If the blue "RDY" LED is blinking and the red "ERR" LED is off, the inverter is ready for operation. The
controller is inhibited.
You can now start the drive.
b) If the red "ERR" LED is lit permanently, a fault is pending.
Eliminate the fault before you carry on with the functional test.
LED status displays
"RDY" LED (blue)
off
blinking (1 Hz)
blinking (2 Hz)
on
56
Start/
Stop
"ERR" LED (red)
Status/meaning
off
No supply voltage.
off
Safe torque off (STO) active.
blinking fast (4 Hz)
Safe torque off (STO) active. Warning active.
off
Inverter inhibited.
lit every 1.5 s for a
Inverter inhibited, no DC-bus voltage.
short time
blinking fast (4 Hz)
Inverter inhibited, warning active.
on
Inverter inhibited, fault active.
off
Inverter enabled.
blinking fast (4 Hz)
Inverter enabled, warning active.
blinking (1 Hz)
Inverter enabled, quick stop as response to a fault active.
20 Hz
The drive rotates according to the set-
point specified.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis