Herunterladen Inhalt Inhalt Diese Seite drucken

Basic Wiring Diagram - Panasonic CZ-ANC3 Einbauanleitung

Vorschau ausblenden Andere Handbücher für CZ-ANC3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 38

Basic wiring diagram

Connect the inter-unit control wiring as shown in the fi gure.
 When connecting interface adaptor, read the installation instructions supplied with
each product.
Power Source
ON/OFF Controller
100-240V ~
N
L
Power suply
wiring
Schedule Timer wiring
This unit
Signal terminal
Power supply
board
terminal board
100-240V
FG
FG
How to attach the ring pressure terminal
For power supply wiring
• Process the end of each wiring and attach the
ring pressure terminal (fi eld supplied item).
For shield wiring
• Process the end of the each wiring and attach the ring pressure terminal
(fi eld supplied item).
 Remove wiring coat.
 Cover with the tape.
 Attach ring pressure
terminal.
Attention
 Ground the shield on both sides of shield wiring,
ohterwise an operation error from noise may occur.
L
N
FG
U1
U2
T1 T2
Schedule Timer
T1 T2
U1 U2
U1
U2
Communication wiring
(pink + blue)
Outdoor
Outdoor
unit
unit
Inter-unit control wiring
U1
U2
• No polarity
Ground
Ground
U1
U2
Ground
Indoor
unit
1-1
Field supply
100 m or less
Schedule timer
Strip
Shield mesh
Strip
Insulation tape
Shield mesh
Ground
U1
U2
Ground
Indoor
Indoor
unit
unit
1-2
Power supply wiring
(white & black)
Wiring for earth
(green)
Ring pressure
terminal
Shield wiring
Ground
7
(EN)

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis