8 Putting out of operation

8 Putting out of operation
► When putting the system out of operation, ensure that the procedures for switching off the welding
components are observed.
Switch on/off the device.
1
Wait until the shielding gas post-flow time has passed.
2
Close the shut-off valve for the gas supply.
3
Switch off the power source.
4
Disconnect the power supply/power source communication connection cable from the device.
5

9 Maintenance and cleaning

Scheduled maintenance and cleaning are prerequisites for a long service life and trouble-free operation.
The maintenance cycle is determined by the work environment and by the length of the scheduled intervals
between maintenance of the devices. The maintenance cycle is usually three months. If the device is
operated for more than 8 hours a day, the maintenance intervals should be changed as needed.
Electric shock caused by damaged or improperly installed cables
The use of damaged or improperly installed cables may result in a potentially fatal electric shock.
► Check all live cables and connections for proper installation and damage.
► Have any damaged, deformed, or worn parts replaced by a qualified electrician only.
Risk of injury due to unexpected start
If the device is energised during maintenance, cleaning or disassembly work, rotating parts may
unexpectedly start up and cause crushing.
► Switch off the device.
► Disconnect all electrical connections.

9.1 Maintenance intervals

The specified intervals are standard values and refer to single-shift operation. We recommend recording the
inspections. The date of the inspection, the detected defects and the name of the inspector must be recorded.
The following maintenance schedule represents the absolute minimum required. Maintenance at more
frequent intervals is necessary if the device is operated under harsh ambient conditions. Replace damaged
parts immediately.
Tab. 7
Maintenance and cleaning intervals
Interval
Daily
As needed
► If you have any questions or problems, consult an appropriate specialist retailer.
EN - 26
WARNING
CAUTION
Required actions
Clean the device.
Check that the assembly is
secure.
Check function.
Replace any loosely attached
or defective components.
Description
► Clean the device with a wire brush and scour with compressed
air to remove weld spatter.
► If necessary, replace any heavily soiled components.
► Clean welding dust and metal swarf from base plates.
► Clean the rollers of guide arms/roller units and check their ability
to run.
► Check that the welding torch mount, handle, base plate, guide
arm and screws are securely attached and, if necessary, retighten
them.
► Check that all connections are secure.
► Check that the control elements are functioning correctly.
► Check all cables and plastic sheaths for damage and soiling,
and replace if necessary.
► Have speed controllers and travel direction and weld start signal
switches replaced by professionals.
► Have any damaged cables replaced by professionals.