Nut M20
Adjusting rod
Nut M22
Washer
7. Feed the steel cable through the top of the column and install the M22 nuts on it.
8. Adjust each rack to the same height by tightening or loosening the nuts.
9. Set each rope to the same tension by tightening or loosening the nuts.
Installing the mechanical safeties
1. Make sure all air hoses are properly connected and air pressure is set at 6-8 bar.
2. Check that the fuses of the four columns engage evenly. If they do not, repeat the adjustment procedure
described above.
3. Check that the end of the safety rod is inside the stop frame.
Installation and connection of the hydraulic power unit
1. Attach the hydraulic power pack to the front left column
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved