Herunterladen Inhalt Inhalt Diese Seite drucken

ATH Four Lift 55HAP Bedienungsanleitung Seite 101

4-säulen-hebebühne
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2.9.2.7
Proper maintenance of the steel ropes
In the beginning, the steel ropes will stretch a little. After one week and after three months, the steel ropes need
to be readjusted. Failure to do so will result in uneven lifting.
Make sure all ropes are properly routed and on the correct pulleys
Lift the lift from all safety interlocks until the ropes support the platforms
Check that all ropes are evenly tensioned and that the platforms are lifted evenly. If not, repeat the
adjustment procedure described previously
2.9.2.8
Electrical connection of the power unit
Warning
Connection work must be done by a qualified technician. Make sure that the power supply is
correct. Make sure that the phases are connected correctly.
1. Attach the control panel to the main column using the screws provided
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
101

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis