Mount the ramps to the platforms
3
4
Bolt for ramp
Drive-up ramp
Front wheel stops
Cover
2.10

Before commissioning

Warning
Before commissioning, check all fastening screws, electrical, pneumatic and hydraulic lines
and tighten them if necessary.
Caution: Some of these must be checked at regular intervals and tightened if necessary.
2.10.1

Setting the lifting platform

Check the function of all buttons. Make sure that all detents are unlocked when the Lower button is pressed.
Check the horizontal position of the rails using a spirit level, in the following two setting options:
Synchronized position:
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
1
2
109

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis