Herunterladen Inhalt Inhalt Diese Seite drucken

Foundation Plan - ATH Four Lift 55HAP Bedienungsanleitung

4-säulen-hebebühne
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
2.9.1

Foundation plan

Attention
Do not mount the lifting platform on asphalt or soft screed. There must be no expansion joints
or cracks that would interrupt the continuity of the reinforcement. The load bearing capacity
of false ceilings must be checked by the operator.
The lifting platform may be impaired in its function by standing at an angle.
Observe the specified concrete quality and curing time
Concrete quality
Curing time of concrete
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
90
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
C20/25
Min. 20 days

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis