ü Raise the lifting platform to a height of approx. 600 mm.
ü
By screwing in or out the fastening nut for the lifting ropes
Detent adjustment:
ü "Park" the lifting platform in the first detent.
ü
The horizontal position can be adjusted by screwing the fastening nut for the detent rod
1
Then raise the lifting platform completely and lower it completely. Check the synchronization. If necessary, this
must be adjusted again.
Note
Readjustment of the hoist ropes after a short period of operation may be necessary due to the
material and is not a warranty claim, but a maintenance task that is the responsibility of the
user.
2.10.2

Security checks

General checks
Make sure that all four columns are at the right angle
Make sure the lift is anchored to the ground and all anchoring bolts are tightened
Make sure all bolts, nuts and screws are tight
Checks under load
Perform two to three complete cycles of raising and lowering under load.
Repeat all checks as described under "General checks".
Listen for loud noises during the lifting/lowering process
If the lifting platforms are at different heights, repeat the leveling process
Note
After installation, fill out the attached
This information will be needed in case of a possible service case.
® Copyright ATH-Heinl GmbH & Co. KG / All rights reserved / Misprints and technical changes reserved
110
2
Release date: 16.03.2023 / Product manufacturer ATH-Heinl GmbH & Co. KG
the horizontal stand can be adjusted.
"Test
book".
in or out.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis