Herunterladen Inhalt Inhalt Diese Seite drucken

Checchi & Magli BABY COMPACT Bedienungs- Und Wartungsanleitung Seite 59

Vorschau ausblenden Andere Handbücher für BABY COMPACT:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Adjusting the dispensing / ejection timing
When the plant falls into the ploughshare (C), the ejector
(B) should be in the rear position and should then start
pushing the plant to eject it.
D
E
UN41 0367AL
Proceed as outlined below.
1) Remove the plug (D).
2) Remove the lid (E).
3) Loosen the screws (A).
4) Turn the dispenser clockwise to speed up the ejec-
tor's pushing action or rotate the dispenser anticlock-
Adjusting the opening of the cup
The opening can be adjusted if the work vehicle is
equipped with a dispensing unit with cups that can be
opened.
For this operation, proceed as outlined below.
1) Loosen the screws (A).
2) Turn the cam (B).
The cup must reach maximum opening approximately
at the centre of the hopper (C).
3) Tighten the screws (A).
Information
After the adjustment check the correct timing be-
tween the dispensing unit and the ejector (see "Ad-
justing the dispensing / ejection timing").
English language
ADJUSTMENT INFORMATION
A
If the conditions allow high- or low-speed planting, cor-
rect timing between the dispenser and the ejector can
be maintained by adjusting the dispenser.
wise to delay the pushing action. The notches on the
dispenser allow accurate timing adjustment.
5) Tighten the screws (A).
6) Place the lid (E) on the dispensing unit.
7) Insert the plug (D).
UN41 0364AL
15
C
B
B
C
Use and maintenance
5
A

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis