Herunterladen Inhalt Inhalt Diese Seite drucken

Preparing For Commissioning - KNF LABOPORT SH820G Originalbetriebsanleitung

Vakuumsystem
Vorschau ausblenden Andere Handbücher für LABOPORT SH820G:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Setup and connection
40

8.1 Preparing for commissioning

Ensure the following points before switching the vacuum sys-
tem on:
Necessary operating requirements
Vacuum
- Connect all hoses correctly
system
(see Chapter Connecting the pump [} 43])
Vacuum
- Data of the voltage supply system are consis-
system
tent with the details on the type plate of the vac-
uum system.
- Vacuum system outlet is not closed or re-
stricted.
- When operating with gas ballast:
When venting the pump through the air inlet, no
explosive or poisonous mixtures can occur.
Vacuum
- Collection flasks correctly mounted (with flask
system
clamps).
(see Chapter Connecting the pump [} 43])
Tab.19: Operating requirements for commissioning
Translation of Originial Operating Instruction, KNF 325562-325564 02/23
Vacuum system SH820G / SR820G / SH840G / SR840G

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis