Herunterladen Diese Seite drucken

EFOY ProEnergyCase 2020P-3 Bedienungsanleitung Seite 64

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation check list
Required action
1)
Open / unlock the EFOY ProEnergyCase.
2)
Check that the main switch of the EFOY ProEnergyCase is turned off.
3)
Optional: If your ProEnergyCase is equipped with a router, configure it.
4)
Connect the wiring of the electrical consumer (deactivated).
5)
If necessary, connect the wiring of the solar module. Make sure that the
solar module is protected from light for the duration of the entire
installation.
6)
Put the EFOY Fuel Manager to the prepared foam part and fix it. Plug in
the prepared cables.
7)
Insert the EFOY fuel cartridges and connect the fuel cartridge connectors
of the EFOY Fuel Manager to the fuel cartridges
8)
Insert the battery / batteries.
9)
Connect the batteries to the prepared battery terminals: two cables
(power and sense line) for the positive terminal and two cables for the
negative terminal. Note the differences in the wiring for 12 V and 24 V.
10) Install the fuel cell in the ProEnergyCase, fix it, and screw the fuel cell
connector to the Fuel Manager.
11) Connect the exhaust hose to the EFOY fuel cell.
12) Connect the prepared charging cable, the power cable of the Fuel
Manager and the prepared communication cable(s) to the fuel cell.
13) Mount the operating panel and fix it to the top-hat rail in the lid of the
ProEnergyCase. Plug the communication cable into the prepared
coupling in the cable canal next to the operating panel.
Page 64
Commissioning

Werbung

loading