Herunterladen Diese Seite drucken

EFOY ProEnergyCase 2020P-3 Bedienungsanleitung Seite 62

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Remove the capo f the EFOY Fuel Manager.
Screw the fuel cartridge connector of the EFOY fuel cell to the EFOY Fuel
Manager.
Plug in the prepared exhaust hose to the EFOY fuel cell.
Plug in the prepared communication cable (RJ12) to the EFOY fuel cell.
If your ProEnergyCase is equipped with a router, plug in the prepared RJ45
Ethernet cable to the EFOY fuel cell.
Plug in the prepared power cable of the EFOY Fuel Manager to the EFOY fuel cell.
As a last step: plug in the power cable of the EFOY fuel cell.
The operating panel (control panel) is not part of the scope of delivery of the ProCube
but is offered separately on request. To connect the operating panel, please proceed as
follows:
Page 62
Commissioning

Werbung

loading