To easily commission the EFOY ProEnergyCase, please follow the steps described in
this chapter. In addition, use the commissioning checklist, see chapter 3.11.
To decommission the EFOY ProEnergyCase, please follow the decommissioning
checklist, see chapter 7.
Risk of electric shock!
Check that the main switch of the power solution is turned off during
installation.
Follow the sequence given here during installation and commissioning.
1.
Preparation of router (if included in the ProEnergyCase).
2.
Preparation of cabling for load connection and PV modules (if
applicable)
3.
Installation of EFOY Fuel Manager
4.
Installation and connection of EFOY fuel cartridges
5.
Installation and connection of battery
6.
Installation and connection of the EFOY fuel cell
7.
Installing the operating panel
8.
Switching on the main switch
Installation and maintenance may only be carried out by authorised persons
who are familiar with all safety regulations and ensure compliance with them.
When installing the EFOY ProEnergyCase, make sure that the ambient
temperature is within the permissible temperature range of the EFOY or EFOY
Pro fuel cell and the EFOY fuel cartridges.
Page 52
Commissioning