Herunterladen Diese Seite drucken

EFOY ProEnergyCase 2020P-3 Bedienungsanleitung Seite 63

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Commissioning
Bedienpanel
Hutschienenhalter
Make sure that all cables are correctly and properly connected or plugged in. Then
switch on the main switch of the power solution.
Check that all components are operating correctly. Specifically, test whether the router
(optionally installed, depending on the variant) establishes an Internet connection and
whether you can control the energy solution via the EFOY Cloud.
Unpack the operating panel from its
separate box.
Screw the operating panel to the
DIN-rail holder that is include in the
scope of delivery.
Plug the spiral RJ12 cable into the
operating panel. You find that cable
in the accessory box of the
ProEnergyCase
Mount the operating panel in the
ProEnergyCase. Use the DIN-rail
marked in the image on the left hand
side.
Afterwards plug in the loose end of
the spiral RJ12 cable to the
prepared coupling. The coupling is
placed in the cable canal below the
operating panel.
For a more user-friendly handling,
you can take the off the DIN-rail and
hold in in your hand. Make sure that
the spiral cable does not cause
problems when closing the lid of the
ProEnergyCase.
Page 63

Werbung

loading