Herunterladen Inhalt Inhalt Diese Seite drucken

VESTEL EVC04-Serie Installationsanleitung Seite 28

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Power Optimizer Meter should be placed just after the main switch of the house as shown in the
figure-18.
Power Optimizer Meter wiring connections can be made according to the information below. See
section 2.6.1- Data Cable Connection
Three Phase
IN
L1
L2
L3
N
22-23: A-B (COM) Modbus connection over RS485 for three phase charging station models. (See
section 2.6.2- STP Connection)
10-11: A-B (COM) Modbus connection over RS485 for single phase charging station models. (See
section 2.6.2- STP Connection)
Related board wiring of Power Optimizer connections can be made as shown below:
IG v7.3.0 2021
Figure-18
OUT
+
L1
+
L2
L3
N
Figure-19
© 2021 Vestel - All rights reserved
Single Phase
IN
L
OUT
L
+
N
+
N
English - 27

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis