Switch on and testing
4. Switch on and testing
4.1 Start-up check
Figure 4
FeVac One inital display
12
When all connections have been made, first switch on all FeVac
FeVac One unit using the power switch at the rear.
As soon as the systems are switched on, FeVac One starts testing the FeVac Two systems.
Initally, the FeVac One display shows four stars. These count down from four to zero as each FeVac Two
is checked. If no errors are discovered in the FeVac Two system, the display continues to run through the
checking loop.
The bottom right of the display indicates the number of microprocessor failures (watch dog timer), if any,
counting upwards from W000 to W999; this number is also stored internally.
**** FEVAC 1 ****
SYSTEM: OK
W000
Two units and then switch on the
®