6.4. REQUIRED QUALIFICATIONS FOR INITIAL START-UP AND CYLINDER

CHANGING

The test protocols from the piping according to tightness and if necessary, moisture and particles are
available
In process gas tubing is only standard gas (see 1.2)
The start-up is only realized by qualifi ed personal
Wear safety clothes according to regulations
Use spark-free tools and provide before installation
Before fi rst start-up check type label, if the component is suitable for the provided purpose (gas, pressure,
material, etc.)

6.5. INITIAL START UP

All requirements are fulfi lled as on point 6.4
Shut-off valve is closed, red marking is visible
WARNING!
Make sure the valve are not exposed to pressure levels that exceed their respective permissible nominal
pressure.

6.5.1. FILL THE PROCESS GAS TUBING WITH PROCESS GAS

Open the shut-off valve slowly and carefully.
The shut-off valve is now in operation.
It is recommended to check the shut-off valve daily and to check the tightness.

6.5.2. TAKING GAS SUPPLY OUT OF OPERATION

Close shut-off valve.
Shut-off valve is now out of operation. Reparation and/ or maintenance work could be done now.

6.6. TESTS

After pressurizing check the function of shut-off valve.

7. OPERATION

In reference to chapter 2.1 the operation of the cylinder regulator is defi ned.
BEWARE!
Cylinder regulators must always be opened slowly and carefully to prevent pressure surges in the system
and damage to the other components!
For a brief interruption of gas removal it is suffi cient to close the shut off or regulating valve on the regulator.
For a longer interruption the regulator must be released from pressure by turning the handwheel anti clock-
wise. Close the cylinder valve as a safety precaution.

8. MAINTENANCE

8.1. SAFETY NOTES FOR MAINTENANCE

NOTE!
Maintenance may only be performed by suffi ciently qualifi ed, trained and authorized individuals (see sec-
tion 2.4)

8.2. MAINTENANCE PLAN

The following sections describe the maintenance works that must be performed to ensure the optimum and
trouble-free operation of the regulator.
If regular inspections reveal increased wear, the requisite maintenance intervals must be shortened to refl ect
the actual wear and tear.