5.3. PACKAGING

The individual consignments are packed according to the anticipated transport conditions. Without exception
all packaging is made of environmentally friendly material.
EN
The packaging is intended to protect the individual components against transport damage, corrosion and
other damage until they are ready for installation. Do not, therefore, destroy the packaging; only remove it
when assembly is imminent.
NOTE!
Risk of environmental harm through incorrect disposal!
Packaging materials are valuable raw materials. In many cases they can be re-used or recycled. Incorrect
disposal of packaging materials can harm the environment.
Dispose of packaging materials in an environmentally compatible manner.
Observe locally applicable disposal regulations. If necessary, commission a specialist disposal fi rm.

5.4. STORAGE

Store the packages in the following conditions:
Do not store outdoors
Store in a dry and dust-free location
Do not expose to aggressive media
Protect from sunlight radiation
Avoid mechanical jolts
Storage temperature: 15 to 35 °C
Relative humidity: max. 60 %
If storing for longer than 3 months, regularly inspect the general condition of all parts and the packaging.
If necessary re-apply or renew the rust-proofi ng
TIPS AND RECOMMENDATIONS!
Some packages may bear labels with storage information that extends beyond these requirements. These
notes should be observed accordingly.

6. INSTALLATION AND INITIAL START-UP

6.1. SAFETY NOTES FOR INSTALLATION AND INITIAL START-UP

STAFF
Installation and initial start-up of the system may only be performed by qualifi ed staff .

6.2. PREPARATION

UNPACKING
The system components should be removed from their packaging carefully and prudently.
Additional protective packaging should also be removed.
Check all components of damages from transport
DEPRESSURIZE
Depressurize components and purge with inert gas if necessary
Cut tubing with special tool; avoid contaminations (dirt, cuttings, etc.)
Check perfect condition of components and purity of connections

6.3. INSTALLATION

In most cases the shut-off valve is mounted with compression fi ttings. First remove the plastic caps from inlet
and outlet. Insert the piping completely into the compression fi tting. Than screw the nut hand tight. After that
screw with a jaw spanner 1 ¼ turns tight (fi rst installation 1 1/4 turns for tubes bigger than 1/8 inch and 3/4 turns
for 1/8 inch and smaller tubes, retightening 1/4 for all tubes).